Solar Photovoltaic (PV) System Turn ON Process

 

electrical_hazard_warning_sign_sticker

You can reduce the Electrical hazards by keeping the order!

 

The Right Sequence is the following:

  1. Turn ON the D/C Isolator switch which located next to the Solar PV Inverter or underneath if Is Integrated.
  2. Turn ON the Single Phase A/C Isolator which located next to the Solar PV Inverter
  3. Turn ON the RCD switch (Located inside your Fuse Board)..
  4. Turn ON the Main A/C Isolator next to the Distribution Board(Fuse Board).